- This topic is empty.
-
PenulisTulisan-tulisan
-
Kallio
TamuWatts regulator instruction manual
.
.
Download / Read Online Watts regulator instruction manual
.
.
..
Watts 909 OSY shown Designed for inline servicing NOTICE For Australia and New Zealand, line strainers should be installed between the upstream shutoff valve and the inlet of the backflow pre-venter. Testing For field testing procedure, refer to Watts installation sheets IS-TK-DL, IS-TK-9A, IS-TK-99E and IS-TK-99D found on watts.com.
filexlib. Quickly create your specifications with SpecHUB, the comprehensive project specification tool that helps you specify Watts products according to building requirements & codes. Learn More. AquaLock™ Push-to-Connect Fittings Designed and manufactured for many years of service life, AquaLock fittings are your first choice for reliability. We have an extensive library of installation videos available to help guide you through the process of properly installing your Watts product. Search Installation Instructions Contact Us Watts Canada 5435 North Service Road Burlington, ON L7L 5H7 905-332-4090 1-888-208-8927 fax: 905-332-7068 Follow Us Corporate Locations
Watts Regulator suggests the use of the Watts Series U009AQT for added installation savings. c. If using a Double Check Assembly in meter box (see Fig. 4 and Fig. 5), install the union outlet in the vertical down posi-tion. 3. Secure to the wall, anchoring through the faceplate. 4. Connect the threaded 3⁄4″ or 1″ (20 or 25mm) inlet to the do-
Regulator & Pilot Combinations. HD-PP/PP-5 Pilot-Operated Presssure Regulating Valves: 15 pages, PDF (2 MB) HDT & DT Pilot-Operated Temperature Regulating Valves: 6 pages, PDF (200 KB) HDA & DA Air-Operated Pressure Regulating Valves: 6 pages, PDF (183 KB) PTR & PTL Pneumatic Temperature Controllers: 2 page, PDF (99 KB)
1. Install high side hose between TC #2 and tester connection A. 2. Open VA then TC #2. Bleed hose, then close VA. 3. Close shutoff valve #2 then #1. Push – Print Head (wait) then Push – Start Test 4. Slowly open VA when air inlet float opens, push “hold” button for at least 2 seconds. Record differential reading (must be 1 PSID or more). Close VA.
Watts Regulator Co., Water Technologies, Inc. designer, fremstiller og sælger produkter, løsninger og systemer, der styrer og bevarer strømmen af væsker og energi ind i, gennem og ud af bygninger på erhvervs- og boligmarkederne i Amerika, Europa, Asien- Stillehavet, Mellemøsten og Afrika.Deres embedsmand website er WATTS.com.. En oversigt over brugermanualer og instruktioner til WATTS
upstream of the regulator. 3. Prior to installing the regulator, flush out the supply pipe to clear it of chips, scale, dirt, etc. 4. Install the Watts regulator in the supply line to the boiler with the arrow on the valve body pointing in the direc-tion of flow to the boiler. NOTICE! CAUTION! WARNING Read this Manual BEFORE using this equipment.
Related Manuals for Watts OneFlow. Water Filtration Systems Watts OneFlow OF1465 Installation, Operation And Maintenance Manual. Anti-scale systems chemical-free, salt-free scale prevention (12 pages) Las piezas defectuosas están sujetas a inspección por parte de Watts Regulator 7. Les pièces défectueuses seront soumises à une
⁄ ” (15 – 20mm) 2 4 Installation Instructions 1. The Watts Feed Water Pressure Regulator must be installed on the cold water supply line to the boiler. It may be installed in either vertical or horizontal position. Allow suffi cient clearance to operate the fast fi ll and purge lever. 2. Install a shutoff valve upstream of the regulator.
Page 8: 6-Month Maintenance. 6-Month System Maintenance Order filter by calling Watts at 1-800-224-1299 Step E – Clean the filter housings (bowls) with a mild soap solution and Item Needed: EDP# 7100110 rinse with water . Check O-rings Includes: and lubricate with water soluble •
The Watts Feed Water Pressure Regulator must be installed on the cold water supply line to the boiler. It may be installed in either vertical or horizontal positions. Allow sufficient clearance to operate the fast fill and purge lever. Install a shutoff valve upstream of the regulator.
The Watts Feed Water Pressure Regulator must be installed on the cold water supply line to the boiler. It may be installed in either vertical or horizontal positions. Allow sufficient clearance to operate the fast fill and purge lever. Install a shutoff valve upstream of the regulator.
Manual | Software Update of the Watts® Vision Central Unit with capacitive touch screen Manual |Central Unit BT-CT02-RF Watts® Vision Version 2.xx, resistive touch screen Manual Central Unit BT-CT02-RF Watts® Vision Version 3.1, resistive touch screen Manual Repeater BT-FVR02-RF Manual | Temperature Outdoor Sensor BT-OS02-RF.
Watts regulator met de hand
Watts regulator bedienungsanleitung
Watts regulator handleiding
Watts regulator handbuch
Watts regulator service guide -
PenulisTulisan-tulisan